▌近日,在利比里亚工地,山推建友L3B-2000沥青站顺利完成安装调试,正式投入蒙罗维亚公路建设项目。
Recently, at the Liberia construction site,Shantui Janeoo's L3B-2000 asphalt plant was successfully installed, commissioned, and officially deployed for the Monrovia Highway project.
▌山推建友L3B-2000沥青站采用积木搭接式结构,一二级除尘集成在滚筒上方,紧凑布局、占地面积少、安装便捷,有效保障了整站的安装周期缩短5至10天。
Shantui Janeoo L3B-2000 asphalt plant adopts a building block lap structure, and the primary and secondary dust removal is integrated above the drum, with compact layout, small footprint and convenient installation, which effectively guarantees that the installation cycle of the whole station is shortened by 5 to 10 days.
▌在沥青原材料计量方面,它采用双骨料秤平行计量,高精度粗精称沥青二次称量,保障配料速度的同时让计量更精准。配置高效免维护振动筛,也有效地保障了物料筛分效果。节能型干燥滚筒、大容量搅拌主机为物料搅拌提供保障,实现产能同比增加10至15%。
In terms of asphalt raw material measurement, it adopts double aggregate scale parallel measurement, high-precision coarse and fine asphalt secondary weighing, ensuring the batching speed and making the measurement more accurate. It is equipped with a high-efficiency maintenance-free vibrating screen, which also effectively guarantees the material screening effect. The energy-saving drying drum and large-capacity mixing host provide guarantee for material mixing, and the production capacity has increased by 10 to 15% year-on-year.
▌山推建友L3B-2000沥青站凭借高效节能、精准计量、免维护筛分等特点为各等级的沥青混凝土路面施工及维护保养提供支持,成为海外施工建设的有力武器,为助力当地道路升级提供了保障。
Shantui Janeoo L3B-2000 asphalt plant provides support for the construction and maintenance of asphalt concrete pavement of various grades with the characteristics of high efficiency and energy saving, accurate metering, and maintenance-free screening, and has become a powerful weapon for overseas construction and construction, providing a guarantee for helping local roads upgrade.